Major
Imports & Export:
Import: Food
grain, Cement clinker, Sugar,
Salt, Fertilizer, General
cargo, Iron Materials,
Chemicals, Coal and Edible oil
etc.
Export: Ready
Made Garments, Knitwear,
Fertilizer, Jute & Jute
Products, Hides and Skins,
Tea, Naphtha, Molasses, Frozen
foods etc.
Recently
Completed Projects:
Construction
of a Container Terminal at
New-Mooring area of
Chittagong
Port.
(Completed in 2008);
IDA
funded Feasibility study for
construction of one new ICD
near Dhirasram Railway Station
in Gazipur District (Completed
in 2007);
ADB
funded Port Efficiency
Improvement Project (PEIP).
(Completed in September 2008).
Techno-Economic
Feasibility Study for
Deep
Sea
Port
in
Bangladesh
(Completed in June 2009).
Ongoing
Projects:
ADB
Funded
Chittagong
Port
Trade Facilitation Project
(CPA Component) (Estimated
Cost : Tk. 13000.00 Lakh);
Construction
of Backup facilities behind
berth no. 4 & 5 of
New-Mooring Container Terminal
(NCT) (Estimated Cost : Tk
11448.00 Lakh);
Capital
dredging and Bank Protection
Work with jetty facilities in
Karnaphuli
River
from 3rd
Karnaphuli
Bridge
to Sadarghat jetty (Estimated
Cost: 37634.22);
Appointment
of Private Global Terminal
operator for operation &
management of New-Mooring
Container Terminal (NCT) on
SOT basis;
Construction
of one ICT at Pangaon
(Estimated Cost: Tk 17757.00
Lakh);
Introduction
of Personnel Management
Information System (PMIS);
Installation
of VTMIS. (Estimated Cost:
4500.00 Lakh);
Shifting
and Reconstruction of Service
Jetty located near Dock office
to upstream of Jetty No, 1
within Chittagong Port
restricted area (Estimated
Cost: 6300.00 lakh);
Construction
of one Multistoried vehicle
parking shed for 5,500 units
(Estimated Cost: 5000.00 lakh);
Replacement
of River Mooring no. 3 and 4
by Dolphin Jetty (Estimated
Cost: 6000.00 lakh).
Future
Projects:
Short
Term:
Construction
of Karnaphuli Container
Terminal (KCT) at existing
Jetty-11, 12 & 13 of
Chittagong
Port
;
Preparation
of a comprehensive Master Plan
for Development of the
Chittagong
Port
;
Procurement
of vessels & crafts;
Construction
of one Truck Terminal within
the vicinity of port area;
Renovate
X-Y shed area for FCL/LCL
container stripping and build
a large CFS.
Construction
of a
Modern
Hospital
.
Mid
Term:
Construction
of a Multi-storied Vehicle
Parking Shed.
Construction
of Multipurpose berth with
necessary back up facilities
at existing jetty no. 7-10.
Creation
of berthing facilities for
inland vessels at the upstream
of river Karnaphuli;
Procurement
of one high powered Tug (4000
BHP);
Procurement
of one Patrol Boat;
Long
Term:
Construction
of Patenga Container Terminal
(PCT) outside the port
protected area of
Chittagong
Port
;
Construction
of a modern Container Terminal
upstream of Khal no. 7;
Construction
of one Truck Terminal near
Chittagong Port Access Road (CPAR);
Construction
a connecting road between CEPZ
square and Baro Pole;
Develop
specialized sheds and CFS for
GCB in the Marine Workshop
area;
|