Welcome to asiatradehub.com   

My ATH | Sign Up Now

Your Business To Business Portal

 

Home Asian Contents TradeHub Gallery BuySell Leads

Products Hub

Bangladesh Infrastructue > Power

Contents

Contents

General Detail

General Information

Infrastructure

Vision 2021

Introduction

Surface Transport

Industry

Roads

Ports

Telecom

Power

Oil & Gas

Budget

Budget 2011-12

Banking

Banking

Travel

Travel

Policies

Export Policy

Import Policy

Trade Policy

Foreign Policy

Economic Policy

Trade

Trade

Foreign Direct Investment

Tax Structure

Tax System

Important Contacts

Important Contacts

 Previous Page

1 2 3 4 5 6 7 8

Next Page

Power Saving Activities

 

To ensure energy conservation and efficient use of electricity under load management and system supervision, it has been possible to save around 350 MW of electricity by undertaking actions like keeping Shopping –malls and Shopping centers closed after 8 p.m. Establishing Solar Panels in government, semi-government, autonomous bodies and industries have been initiated. The relevant consumers are encouraged to keep the temperature of Air-cooler at 250 Celsius or higher and are prohibited to use Air-cooler in the evening peak hours. Initiatives have been underway to establish 20.0 lakh pre-paid meters countrywide to facilitate electric bill payment for consumers and to control and determine power load by distributing institution. A number of steps have been taken to control electricity demand on the receiving end by using power saving handy equipments. Steps have been taken to replace around 4 crore ineffective electric lamps by power saving Compact Fluorescent Lamps (CFL) under Efficient Lighting Initiatives for Bangladesh (ELIB) programme. It will be possible to install 1.05 crore power saving CFL bulbs by 2010. this will also ensure Clean Development Mechanism (CDM) facilities.

 

In order to overcome the present power deficit situation, targets are fixed up in the outlines of Bangladesh Perspective Plan and on reaching these goals it will be possible to have access to power by all citizens within 2021.A huge investment is required to go towards the preferred level from the prevailing power deficit situation. Initiatives have been on to ensure public as well as government-patronized private investments and Foreign Direct Investments. In this sector investment to amount of taka USD 9.00 billion is required out of which USD 8.00 billion is expected to come from private sector in order to raise power generation to 11,625MW within 2015.Initiatives have been taken in this comprehensive plan to transmit, distribute, adopt demand side management, use renewable fuels, rationalize prices separately at private investment and consumers’ level due to the existing difficulties of transmission, distribution, power supply and sources along with production in power sector. The prevailing power crisis will be reduced in 2012 if this plan is implemented on time and every citizen will have access to power in 2021.

 Previous Page

1 2 3 4 5 6 7 8

Next Page

Currency Converter 

this amount
enter any amount
of this type of currency

scroll down to see more currencies
into this type of currency.

scroll down to see more currencies

Feedback | Contact Us | Link Us | Site Map Press Release Terms & Conditions | Important Contacts | Tender Gallery | Sales Agreement

About Us | Advertise With Us | New Visitors | Benefits | Buy/Sell Guide | Bidding Guidelines | Astro BuzzChat | Services | Members Login

  2000- Matrix net-on-line Limited , All Rights Reserved /Disclaimer

ADVERTISE HERE